Florida DEP Updates CGP for Stormwater

Florida DEP updated the Construction General Permit in February 2015.  One of the biggest changes in the permit is it now includes dewatering.  Also, the permit clearly details that a SWPPP plan must be in place prior to construction.  If you need assistance with NPDES Inspections, Erosion Control Installation, or SWPPP development KCI can assist.

Construction GP Rule 62-621.300(4)(a)

Nonpoint Source Water Pollution

The Environmental Protection Agency (EPA) basically defines nonpoint Source pollution as any source of water pollution

Site Stabilization: It’s Not as Difficult as You Think

It is only expected that on rainy Florida days there would be a little bit of erosion.  This is extremely likely on con

4 Differences Between Detention and Retention Ponds

The construction industry is continuing to grow in the United States. Dodge Construction Outlook, reports that total U.

Comments are closed.