Measure up your Stabilization

Measuring up your stabilization is not just a suggestion—it is a necessity. Implementing effective and formidable, best management stormwater practices is critical in mitigating erosion, controlling sediment runoff, and maintaining site integrity. 

Erosion control and soil stabilization are critical components in maintaining the integrity of our ecosystems, especially in Florida, where stormwater management is paramount. The Florida Construction Generic Permit for Stormwater Discharge, particularly under the National Pollutant Discharge Elimination System (NPDES), emphasizes the implementation of Best Management Practices (BMPs) to mitigate the negative impacts of stormwater runoff on water quality. 

It is important to utilize stabilization methods continuously throughout the duration of the construction project to ensure compliance. Here are some examples, but not limited to, stabilization measures or BMP’s that can be implemented: 

  1. Temporary seeding
  2. Permanent Seeding
  3. Mulching
  4. Geotextiles
  5. Sod Stabilization
  6. Vegetative buffer strips

Many times, construction sites are found with limited temporary or permanent coverage leaving vulnerable soil exposed. Stormwater inspectors often find distinct types of erosion such as sheet, rill, and gully’s that are formed that could have been easily prevented with proper planning and temporary stabilization.  Lack of proper stabilization creates a higher cost to repair in the long run, and potentially permit violations.  

Do not underestimate the impact of proper stabilization on your construction site. Investing in specific and effective best management practices is not just a regulatory requirement, it shows your commitment to quality site stabilization and environmental stewardship.  

Ensure your project stands out by prioritizing effective stormwater management today. KCI is a professional stormwater Environmental Compliance company ready to help you evaluate, plan, and implement stormwater temporary or permanent stabilization. Call us today, at 888-436-7779

Cautiousness Pays Off

Construction projects must take precautions to protect local bodies of water such as lakes, rivers, streams and sensiti

Execute an Inspection Plan

Construction site operators must comply with the federal National Pollutant Discharge Elimination (NPDES) stormwater re

Why NPDES Inspections

In the state of Florida construction projects impacting over an acre of land are required to perform National Pollu