Curb Cut Backs

August in Florida is hot and humid, and most of us welcome the summer downpours of rain to help keep us cool. As much as we love our rainy cool downs we also have to remember that with the heavy rains we have to prepare for run-off and erosion, and it’s even more important for active construction sites to maintain effective best management practices. One method is to establish a perimeter control where soil is being disturbed.

A curb cutback is a temporary perimeter control and a simple way of keeping dirt and turbid water from entering the street. A grader can establish a curb cutback before activity takes place by excavating the dirt from behind the curb. This leaves a shallow ditch, which allows dirt to settle out of the water before entering the street.

This cost-effective method can prevent environmental damage, costly repairs, and potential threats of fines if turbid water were to reach our waterways through storm inlets.

Keeping up with Regulatory Requirements

If you are someone who deeply cares about the environment, you might be curious as to whether your construction pro

The Why on NPDES Inspections

In the state of Florida construction projects that impact over an acre of land are required to perform NPDES inspection

The Last Line of De-Fence!

When it comes to sediment control, silt fence is a major factor when trying to retain soil on site. We’ve all seen it,

Comments are closed.