Are you Beginning a Project?
Operators of construction activities that plan to disturb one or more acres of land, or that will disturb less than one acre but are part of a larger
Operators of construction activities that plan to disturb one or more acres of land, or that will disturb less than one acre but are part of a larger
Dust, it's everywhere. It seems to collect everywhere we look. But on a construction site, dust is more than just a nuisance; it is also
Thank you is an expression of gratitude and gratefulness. We realize it only takes a moment in time to say thank you. Are we truly sincere with deep
The Construction Generic Permit (CGP) allows a construction site to discharge surface stormwater associated with large or small construction activity
Believe it or not, Florida does experience seasons. However, not your normal or typical winter, spring, summer and fall. Most of Florida experiences
Have you ever seen a crystal-clear stream, river, or lake? The beauty is mesmerizing, especially when its pristine clarity reflects the landscape. So
Stormwater run-off picks up pollutants and contaminants once it falls to the ground, runs across impervious surfaces, and then eventually flows down
The first step for an industrial facility, which requires a Multi-Sector Generic Permit (MSGP), is to develop a robust strategic stormwater environme
Based on the Florida DEP stormwater permit data, there are approximately 4000 unique Industrial Stormwater Multi-Sector Generic Permits (MSGP) curren
The Minority Women Business Enterprise (MWBE) certification is designed to increase a company's visibility, business continuity, and confidence in th
Copyright © 2025 KCI All rights reserved | (888) 346-7779 | Orlando FL | Orlando Web Design by: M5 | Privacy & Terms | Sitemap